Your brief for this combination
Use this plan when discussing handover planning in a 3-room resale flat, with retain existing items as the priority. The current decision point is completion review. Confirm that these assumptions match your actual home before using the checklist.
A 3-room resale scope should distinguish cosmetic changes from work needed because of existing condition. Demolition can expose issues that photographs and old drawings do not show.
Work to define: Handover planning
Define evidence of completion before the final walkthrough. Use an agreed issue list, operating checks and a record of supplied information rather than relying on a general impression of the finish.
The working deliverable is walkthrough, issue and document register. For this property, start by resolving the following constraint: Separate inspected retained items from items whose condition is still unknown.
Design for retain existing items
Record the condition and dimensions of retained pieces. The design must resolve protection, installation access and finish junctions around them, rather than treating them as unchanging background.
Apply that priority to the walkthrough, issue and document register: Photograph the condition and define protection and making-good boundaries. Discuss the result against the actual 3-room resale flat layout rather than treating a similar photograph as evidence that the detail will fit.
At the completion review stage
Check the agreed scope and operation systematically, recording issues and the next action for each. Distinguish incomplete work, adjustment requests and new work rather than combining them into an ambiguous snag list.
The expected stage output is: A dated issue register, operational checks and relevant handover information. Resolve the retain existing items question within this record, so the priority is carried through the handover planning work rather than lost between drawings, quotations and site instructions.
Four questions to resolve together
- For handover planning: What evidence will demonstrate that each agreed item is complete?
- For retain existing items: Which retained item changes the installation or connection sequence?
- For this 3-room resale flat: Separate inspected retained items from items whose condition is still unknown.
- Before completing the completion review: Assign the remaining action, responsible person and agreed follow-up for each issue.
Build your consultation checklist
Select the outstanding checks. The button creates a brief for this exact planning scenario; it does not send or store personal information.
Property requirements and scope boundaries
Check current HDB requirements for the actual scope and verify the appointed contractor where required. This page does not establish permit eligibility.
Record existing condition, retained items, quantities, named products or specifications, exclusions and responsibility owners. Pricing and feasibility require the actual scope and site information. This scenario does not establish a market price or confirm that any work has been approved.
Further checks: HDB renovation guide.
Read the detailed subject guide
Review the handover planning decisions and quotation checks, then return to this property, priority and stage checklist.